From: route@monster.com
Sent: Thursday, April 07, 2016 11:48 AM
To: hg@apeironinc.com
Subject: Please review this candidate for: p6 Scheduler
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Michael Bean 10664
US HWY 69 N Colmesneil,
Texas 75938 409.429.0639 Objective:A long-term,
challenging construction planner / scheduler position, which will allow me to
utilize my knowledge and experience and offer opportunities to contribute to
the efficiency of the overall organization. Summary: Planning and scheduling for construction
and maintenance outages of oil and gas refineries, petrochemical, power and
utility plants. Development of WBS, code structure and schedule format. Work
with project team to develop appropriate requirements. Work with PM and
vendors to establish appropriate level of detail. Compile basic schedule
reports on a daily and weekly basis. Progress - Actual vs. Planned. Define
primary and secondary critical path. Background includes boilermaker,
pipefitter, crane operator (up to 90 tons), planning, scheduling, estimating,
coordinating, and executing. Employment:
Wyatt
/ Valero
Port Arthur, TX
Planner
Jan
2016 – Feb 2016
Nooter / Husky Energy
Lima, OH.
Planner
/ Scheduler
Feb
2015 - Oct 2015 Re-Vamp Ultraformer
Heater Nooter / BP
Toledo,
OH. Planner
June
2014 - Dec 2014 FCC Unit. Develop
comprehensive job plan packages for scope items. Identify and obtain
pertinent documents, reports and drawings. Perform job walk
downs. Identify safety,
permitting, inspection and environmental requirements. Develop detailed
activities with durations and resource requirement. Develop BOM. Scheduling in P6.
Innovative
Turnaround Controls / DuPontOrange, TX. Planner
/ SchedulerApril
14 - May 14 Ethylene Unit. Input job plans into schedule. Integrate capital
work into schedule. Updated schedule. Run daily reports, look ahead's and
histogram. Scheduling in P6.
Nooter / Nelson
Energy CenterRock
Falls, IL. SchedulerJune 13 - March 14 HRSG. Input job plans
into scheduling software. Package and make
logic ties per scheduling strategy. Identify critical
path and near critical path activities. Produce resource
histograms. Produce daily
shift and look ahead schedules. Enter progress into
schedule. Produce daily
schedule reports.
TTMC / Exxon/MobilJoliet, IL. SchedulerMarch 13 - May 13 FCC Unit. Responsible for
updating schedule. Adding FCO's. Produce daily look
ahead's. Universal
Personnel / SuncorDenver, CO. SchedulerMay 12 - Feb 13 Worked with client
scheduler to developed schedule. Input job plans
into scheduling software. Make logic ties per
scheduling strategy. Identify critical
path and near critical path. Run daily shift and
look ahead schedules. KAP Project
Services / ValeroPort Arthur, TX. SchedulerApril 11 - Mar 12 SRU and Sour Water
Stripper Units. Input work plans
into schedule. Added Resources,
codes and made logic ties. Produce daily and
weekly schedule reports. Added field change
orders to schedule. Flour / ChevronRichmond, CA. SchedulerApril 09 -
July
10 Several small units
turnaround. Entering
activity's, durations, resources and relationships. Identifying
critical path. (CPM) Updating schedule,
creating daily and weekly reports.
Marathon /
Marathon OilRobinson,
IL. Planner/
SchedulerJan
08 - Mar 09 Coker Unit. Mechanical
planning, estimating and coordinating for installation of Delta Valves to be
added on all five coke drums. Pipe racks and associated piping. Entering job steps
and sequence into schedule. (Pretar-Tar-Post) Identifying
critical path. (CPM) Creating logic ties
and updating schedule. Creating daily and
weekly reports. Professional Development: Primavera 5.0 July
2007 – Primavera 6.2 Sept. 2008 Project
Management Oct 2007 Computer Skills: MS Word,
Excel,Power Point and Outlook |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|